|
Highly Efficient Process
1. Materials are fed into a large, sealed, rotary dryer drum.
Materials:
• Aggregate- natural occuring minerals (sand and various size stone) • Recycled asphalt/pavement (RAP) • Liquid asphaltic cement
2. Aggregate is heated, dried, and mixed in the drum with recycled pavement and liquid asphalt.
-Dust collection system continuously filters air and reintroduces remaining stone dust into final step
3. Finished product is moved on a conveyor belt to heated short-term storage tanks.
4. Asphalt is trucked out within hours of production.
The entire process is self-contained with no waste produced.

|